Material Takeoff Calculator
Professional Construction Estimation Tool
Comprehensive material quantity estimation with cost analysis and project timeline
Project Information
Material Categories
Dimensions
Specifications
0.00
Volume (m³)
$0.00
Total Cost
0.00
Weight (kg)
Material Specifications Database
Material | Grade/Type | Density | Typical Use | Standard Size |
---|---|---|---|---|
Concrete M20 | Normal Strength | 2400 kg/m³ | Foundations, Columns | Ready Mix |
Concrete M25 | Normal Strength | 2400 kg/m³ | Beams, Slabs | Ready Mix |
Steel Rebar | Fe 415 | 7850 kg/m³ | Reinforcement | 8mm-32mm dia |
Lumber 2×4 | SPF Grade | 400 kg/m³ | Framing | 1.5″ x 3.5″ |
Drywall | Standard | 700 kg/m³ | Interior Walls | 4′ x 8′ x ½” |
Project Timeline Estimation
Construction Phases
Foundation Work
Excavation, concrete pouring
5-7 days
Framing
Lumber framing, structural work
10-15 days
Roofing
Roof installation, weatherproofing
3-5 days
Interior Work
Drywall, flooring, finishing
15-20 days
Timeline Summary
Estimated Duration
33-47 days
Completion Date
—
Buffer Time (20%)
7-9 days