Pool Resurfacing Cost Calculator
Get an instant estimate for your pool resurfacing project based on size, material, and location factors.
Your Pool Resurfacing Estimate
🏊♂️🚀 Ready to Transform Your Pool?
Get an exact quote from our certified pool professionals in just 2 minutes!
Get a Personalized Quote Today!
Speak directly with a pool specialist to discuss your project details and get an exact estimate.
877-796-5799Call Now – Limited Availability This Season
Get Free Quotes From Local Pool Professionals
Frequently Asked Questions
Our calculator provides estimates based on current market rates for materials and labor in your area. While we strive for accuracy, actual costs may vary depending on specific project details, accessibility of your pool, and any unforeseen repairs needed. For the most accurate quote, we recommend contacting a local pool professional through our form.
The three main factors that affect cost are:
- Pool size: Larger pools require more materials and labor
- Surface material: Basic plaster is most affordable while pebble and tile finishes cost more
- Condition: Pools needing significant repair or preparation work will cost more to resurface
Other factors include your geographic location and the time of year (prices may be higher during peak season).
The resurfacing frequency depends on the material:
- Plaster: Every 5-10 years
- Pebble/Quartz: Every 10-15 years
- Tile: 15-20 years (though grout may need attention sooner)
- Fiberglass: 15-25 years
Signs you need resurfacing include rough texture, visible stains that won’t clean, cracks, or frequent algae problems.
While DIY pool resurfacing is technically possible, we strongly recommend against it for several reasons:
- Specialized equipment and skills are required for proper application
- Improper application can lead to costly problems like delamination
- Most manufacturers require professional installation for warranties
- The surface must be perfectly prepared or the new finish will fail
Professional resurfacing typically comes with a warranty and ensures proper drainage and structural integrity.
The timeline depends on several factors:
- Basic plaster resurfacing: 3-5 days
- Pebble or quartz finishes: 5-7 days
- Tile work: 7-14 days
This includes time for:
- Draining the pool (1 day)
- Surface preparation (1-2 days)
- Application of new surface (1-2 days)
- Curing time before refilling (1-2 days)
Weather conditions can also affect the timeline.